Building upon the partnership developed in a previous building, Athertyn 2000 combined structural steel support posts with knife and base plates within our prefabricated wall panel. This collaboration reduced the amount of field labor by reducing the quantity of field panel distribution beam to structural steel connections. Utilization of BIM (Revit) allowed this integration to occur by aligning the various subcontractors’ models. Additionally, by incorporating Ecospan’s slab perimeter pour stop on top of our panel during panel fabrication we reduced field installation of both the pour stop and sheathing in-fill at floor lines. This 84,600 SF project featured both 6” and 4” panelized structural walls with distribution HSS (Hollow Structural Sections) tubes.
Project Details
- Industry: Residential
- Type: Load Bearing
- Scope: Load Bearing - Interior Walls Non-Bearing - Exterior Walls Panel Feature - Shear Walls Panel Feature - SP Frames
- Service Provided: Prefabrication
Award-Winning Execution
Athertyn 2000 showcases how Klover helps solve complex construction challenges through smarter prefabrication, strategic collaboration, and proven field execution recognized with the 2025 National ABC Eagle Award.
Klover Differentiator
Not Just Installed. Strategically Delivered. Klover combines prefabrication, field expertise, and schedule-focused planning to help teams build with greater certainty.
Why This Project Matters
Athertyn 2000 demonstrates how prefabrication helps projects move faster, reduce labor bottlenecks, and maintain quality on demanding schedules.

